BUILT IN BARCELONA

Ready to produce.

Ready to audit.

The more technical information you share, the more specific our first response can be.

01

Design for compliance

Regulatory requirements translate into design, automation, materials, and documentation decisions from the start

02

Risk-based approach

Risk analysis guides controls, testing, and evidence, avoiding generic documentation that has no connection to the process.

03

Traceability

We link requirements, specifications, risks, and tests so that each criterion has verifiable evidence.

04

Data integrity

When the scope requires it, we include users, roles, audit trails, electronic records, and backup strategies.

APPLICABLE FRAMEWORKS

The right scope for each project.

RIJAT designs according to the applicable requirements agreed with the client. The inclusion of each frame depends on the product, intended use, control architecture, and country of installation.

CE

Safety, risk assessment, and technical file

EU GMP

Annex 1 and Annex 11 when they are applicable

GAMP 5

Lifecycle and risk-based approach

21 CFR

Part 11-ready controls according to functional scope

APPLICABLE FRAMEWORKS

Documentation that connects requirements and evidence.

RIJAT designs according to the applicable requirements agreed with the client. The inclusion of each frame depends on the product, intended use, control architecture, and country of installation.

01          Project Quality Plan

02          URS review & traceability matrix

03          Functional / hardware / software specifications

04          Design risk assessment

05          Material certificates and component traceability

06          FAT / SAT protocols and reports

07          Material certificates and component traceability

08          Manuals, drawings, backups and as-built package

Accuracy in statements.

 

GMP, GAMP 5, and 21 CFR Part 11 are presented as design and compliance frameworks applicable to the project, not as universal certifications for all machines.

 

START A PROJECT

¿Do you have a URS or a process to sort out?

Share the product, packaging, cadence, and target market. Our technical team will structure the next step.